(810) 329-4027

TR Pieprzak Company, Inc.
TR Pieprzak Company, Inc.
  • Home
  • About Us
  • Projects
  • Sand Pits
  • Careers
  • Contact Us
  • More
    • Home
    • About Us
    • Projects
    • Sand Pits
    • Careers
    • Contact Us

(810) 329-4027


  • Home
  • About Us
  • Projects
  • Sand Pits
  • Careers
  • Contact Us

Project information

Innovation Hills

Partridge creek-gloede drain habitat restoration

Sterling Relief drain

Natural Water Features Area at Innovation Hills Park - This project consist of pond excavation, landscaping, bioswales, pathways around the ponds, water wall creation and sundial mound.  This was a design build project working closely with the city representatives and the city engineers.  This was a unique project with a lot of creativity although staying very in touch with the natural settings nature had to offer in the area.  


**This project received the Michigan Concrete Association Award of Excellence for the concrete work on this project.


**This project also received the  2021 Project of the Year in the category of:

Quality of Life - $5 Million to $25 Million 

from the Michigan Chapter of the American Public Works Association.   

Sterling Relief drain

Partridge creek-gloede drain habitat restoration

Sterling Relief drain

Sterling Relief Drain - Drain Day Lighting - This project was a complete design build method to provide improved water quality treatment of the flows into the drain by forcing water out of the underdrain (day-lighting) for water quality treatment on the surface.  Project limits Sterling Relief Drain corridor from Van Dyke Road to the outlet to Red Run.  Lateral inlets were used to direct the drain bottom thus providing full treatment for their service area.  Day-lighting approximately 300 lineal feet of the underdrain at the outlets and construction a sediment basin to capture and remote pollutants from the base flow.  Implemented a three tier landscape transformational plan.  


**This project received the 2021 Project of the Year in the category of:

Quality of Life - $1 Million to $5 Million

from the Michigan Chapter of the American Public Works Association.



Road Right of Way Improvements at Sterling Heights - Create a beautification to Sterling Relief Pocket Park and Dodge Road Park by providing and installing concrete slabs and benches, trees, trash receptacles at both locations.  Also, the demo/removal of the existing fence and gate, replacing it with a new decorative fence/gate combination.

Partridge creek-gloede drain habitat restoration

Partridge creek-gloede drain habitat restoration

Partridge creek-gloede drain habitat restoration

The project consisted of reconstruction of the Gloede Drain, excavation and construction of the stream banks, pond and pools in numerous locations along the drain.  Some of the other features included toe-wood structures, cobble stone riffles, log vanes, rock cutoffs, turtle mounds, clearing and grubbing.  The grading on the project was done with GPS to provide precise grade control and location of special items of work.  Our team worked with the owner and landscape architect to adjust the grading in the field to meet requirements of the existing sire to make the project aesthetically pleasing and drain properly.  There were a large amount of plantings completed on this project where plantings were adjusted to meet the vision and needs of the site.  The site was seeded with multiple seed mixes depending on the area.

2020 Sewer Point REpairs - Clinton Township

Water Main Replacement Projects - Clinton Township

Partridge creek-gloede drain habitat restoration

Completed several sanitary sewer repairs at different locations throughout the Charter Township of Clinton.  The work consisted of but not limited to:

Remove and Replace 8" pipe.

Remove and Replace 10" pipe.

Pavement Removal and Replacement (Asphalt & Concrete) 

Along with any related restoration work associated with the project along the way. 

Water Main Replacement Projects - Clinton Township

Water Main Replacement Projects - Clinton Township

Water Main Replacement Projects - Clinton Township

Completed the replacement of 8" and 12" water main throughout residential streets in Clinton Township.   Along with the replacement, there were water transfers, hydrants, gate valves installed with the new water main.  Being residential and commercial, there was asphalt/concrete driveway replacement, concrete sidewalk replacement and restoration.

clinton River cutoff channel repair at yates

Water Main Replacement Projects - Clinton Township

Water Main Replacement Projects - Clinton Township

Under cooperation with Hubbell, Roth and Clark, TRP installed 80' of SZ-27 sheeting to create a new stream bank by using toe wood and bank wrap methods to redirect the Clinton River.  Log debris was removed in location only near the cut off.  The buried steel sheeting was covered with a earth berm using existing nearby dirt and restored.

INNOVATION HILLS PLAYGROUND

INNOVATION HILLS PLAYGROUND

INNOVATION HILLS PLAYGROUND


The challenge to development and construct a unique, 3-acre playground area consisting of a showcase multi-story tree house, flowing river feature, traditional pay equipment and playground surfacing meeting a universal design requirement appealing to those with special needs, while maintaining infrastructure, drainage, robust landscaping and pathways.  


The pictures above show a unique showcase tree house along with the river feature which starts with the water tables.  Look closely, there is traditional playground equipment mixed in with unique playground equipment which sets this playground out from others.  These pictures were taken before the safety surface was installed.



Land Balancing Projects

INNOVATION HILLS PLAYGROUND

INNOVATION HILLS PLAYGROUND

Process of operations at most land balancing projects but not limited to; installing underground utilities (sanitary sewer, water main & storm sewer), constructing the building pad and grading the project site.  


2020 Projects

Elder Ford Washington Township

Utica Park Apartments

Bradbury

MISD Detention Pond & Storm Sewer

Innovation Hills Playground

Groesbeck Highway M-2 Facility

Char Estates


2021 Projects

Shelby Professional Building

Delano Place

Eagle Ridge Estates

Commons South

Woodside Village

Providence Estates

Preston Corners

23 Mile Road Senior Apartments

Arden Ave Water Main & Pavement Replacement


2022 Projects

Fred W. Moore Hwy. Water Main

Internal Drive Paving & Water Main

Maximus Storage - Kimball Township

Triomphe Land Balancing

2022 Water Main Replacement - Fraser

Mullin Avenue Watermain

East China 2022 Water Systems Improvements - Valves

Plum Hollow Pump Station

30 Mile Road Paving


2023

Pahoa Express Parking

Doetsch Headquarters

Esko Roofing

Gloede Street Watermain

Beech Wood Logjam

Northeast Sanitary Sewer

Harrington Street Watermain

Washington Watermain-Sanitary Ext


Subdivision Projects

INNOVATION HILLS PLAYGROUND

Subdivision Projects

Process of operations at most subdivision projects but not limited to; installing underground utilities (sanitary sewer, water main & storm sewer), install storm separators if necessary, land balancing and site grading.


2020 Projects

Bradberry - 44 Lots

Delano Place - 15 Buildings, 117 units

Char Estates - 30 Lots

Plumbrook - 26 Lots


2021 Projects

Eagle Ridge Estates - 50 Lots

Northern Grove - 14 Buildings, 170 units

Woodside Village - 23 Lots

Monarch Estates Phase III - 70 Lots

Commons South - 12 Lots/24 Units

Providence Estates - 66 Lots

Preston Corners Manors - 52 Lots

23 Mile Road Senior Apartments - 2 Buildings

Veridian - 79 Lots

Valencia @ Monte Clair - 19 Buildings


2022 Projects

Walden Parc - 67 Units

Villa Toscana - 21 Lots

Cortona Park - 12 Lots

ShorePointe Nursing Center - Building Pad

High Society - Building Pad

Galleria at Monte Clair - 17 Buildings


2023

Creekside - 46 Lots

Ball Condominiums - 11 Units

River Pointe Phase III - 25 Lots



Innovation Hills

Finished Project

TR Pieprzak Company, Inc.

TR Pieprzak Company, Inc. 6267 St. Clair Hwy China Twp, MI 48054 US

(810) 329-4027

Copyright © 2024 TR Pieprzak Company, Inc. - All Rights Reserved.

Powered by GoDaddy Website Builder