Natural Water Features Area at Innovation Hills Park - This project consist of pond excavation, landscaping, bioswales, pathways around the ponds, water wall creation and sundial mound. This was a design build project working closely with the city representatives and the city engineers. This was a unique project with a lot of creativity although staying very in touch with the natural settings nature had to offer in the area.
**This project received the Michigan Concrete Association Award of Excellence for the concrete work on this project.
**This project also received the 2021 Project of the Year in the category of:
Quality of Life - $5 Million to $25 Million
from the Michigan Chapter of the American Public Works Association.
Sterling Relief Drain - Drain Day Lighting - This project was a complete design build method to provide improved water quality treatment of the flows into the drain by forcing water out of the underdrain (day-lighting) for water quality treatment on the surface. Project limits Sterling Relief Drain corridor from Van Dyke Road to the outlet to Red Run. Lateral inlets were used to direct the drain bottom thus providing full treatment for their service area. Day-lighting approximately 300 lineal feet of the underdrain at the outlets and construction a sediment basin to capture and remote pollutants from the base flow. Implemented a three tier landscape transformational plan.
**This project received the 2021 Project of the Year in the category of:
Quality of Life - $1 Million to $5 Million
from the Michigan Chapter of the American Public Works Association.
Road Right of Way Improvements at Sterling Heights - Create a beautification to Sterling Relief Pocket Park and Dodge Road Park by providing and installing concrete slabs and benches, trees, trash receptacles at both locations. Also, the demo/removal of the existing fence and gate, replacing it with a new decorative fence/gate combination.
The project consisted of reconstruction of the Gloede Drain, excavation and construction of the stream banks, pond and pools in numerous locations along the drain. Some of the other features included toe-wood structures, cobble stone riffles, log vanes, rock cutoffs, turtle mounds, clearing and grubbing. The grading on the project was done with GPS to provide precise grade control and location of special items of work. Our team worked with the owner and landscape architect to adjust the grading in the field to meet requirements of the existing sire to make the project aesthetically pleasing and drain properly. There were a large amount of plantings completed on this project where plantings were adjusted to meet the vision and needs of the site. The site was seeded with multiple seed mixes depending on the area.
Completed several sanitary sewer repairs at different locations throughout the Charter Township of Clinton. The work consisted of but not limited to:
Remove and Replace 8" pipe.
Remove and Replace 10" pipe.
Pavement Removal and Replacement (Asphalt & Concrete)
Along with any related restoration work associated with the project along the way.
Completed the replacement of 8" and 12" water main throughout residential streets in Clinton Township. Along with the replacement, there were water transfers, hydrants, gate valves installed with the new water main. Being residential and commercial, there was asphalt/concrete driveway replacement, concrete sidewalk replacement and restoration.
Under cooperation with Hubbell, Roth and Clark, TRP installed 80' of SZ-27 sheeting to create a new stream bank by using toe wood and bank wrap methods to redirect the Clinton River. Log debris was removed in location only near the cut off. The buried steel sheeting was covered with a earth berm using existing nearby dirt and restored.
The challenge to development and construct a unique, 3-acre playground area consisting of a showcase multi-story tree house, flowing river feature, traditional pay equipment and playground surfacing meeting a universal design requirement appealing to those with special needs, while maintaining infrastructure, drainage, robust landscaping and pathways.
The pictures above show a unique showcase tree house along with the river feature which starts with the water tables. Look closely, there is traditional playground equipment mixed in with unique playground equipment which sets this playground out from others. These pictures were taken before the safety surface was installed.
Process of operations at most land balancing projects but not limited to; installing underground utilities (sanitary sewer, water main & storm sewer), constructing the building pad and grading the project site.
2020 Projects
Elder Ford Washington Township
Utica Park Apartments
Bradbury
MISD Detention Pond & Storm Sewer
Innovation Hills Playground
Groesbeck Highway M-2 Facility
Char Estates
2021 Projects
Shelby Professional Building
Delano Place
Eagle Ridge Estates
Commons South
Woodside Village
Providence Estates
Preston Corners
23 Mile Road Senior Apartments
Arden Ave Water Main & Pavement Replacement
2022 Projects
Fred W. Moore Hwy. Water Main
Internal Drive Paving & Water Main
Maximus Storage - Kimball Township
Triomphe Land Balancing
2022 Water Main Replacement - Fraser
Mullin Avenue Watermain
East China 2022 Water Systems Improvements - Valves
Plum Hollow Pump Station
30 Mile Road Paving
2023
Pahoa Express Parking
Doetsch Headquarters
Esko Roofing
Gloede Street Watermain
Beech Wood Logjam
Northeast Sanitary Sewer
Harrington Street Watermain
Washington Watermain-Sanitary Ext
Process of operations at most subdivision projects but not limited to; installing underground utilities (sanitary sewer, water main & storm sewer), install storm separators if necessary, land balancing and site grading.
2020 Projects
Bradberry - 44 Lots
Delano Place - 15 Buildings, 117 units
Char Estates - 30 Lots
Plumbrook - 26 Lots
2021 Projects
Eagle Ridge Estates - 50 Lots
Northern Grove - 14 Buildings, 170 units
Woodside Village - 23 Lots
Monarch Estates Phase III - 70 Lots
Commons South - 12 Lots/24 Units
Providence Estates - 66 Lots
Preston Corners Manors - 52 Lots
23 Mile Road Senior Apartments - 2 Buildings
Veridian - 79 Lots
Valencia @ Monte Clair - 19 Buildings
2022 Projects
Walden Parc - 67 Units
Villa Toscana - 21 Lots
Cortona Park - 12 Lots
ShorePointe Nursing Center - Building Pad
High Society - Building Pad
Galleria at Monte Clair - 17 Buildings
2023
Creekside - 46 Lots
Ball Condominiums - 11 Units
River Pointe Phase III - 25 Lots
Finished Project